Superb Modular
Superb Modular · part of the Buildatronix 3D Group · 2026

Homes in days.
Walls in hours.

Factory-built modular homes and robotic 3D construction printing. Two faster ways to deliver beautiful, durable homes.

Head office Manchester, UK · Delivered worldwide
02 — THE PROBLEM

The housing crisis is a speed & skills crisis.

01 — SCALE

1.6 billion

people lack adequate housing worldwide (UN-Habitat estimate).

02 — COST

Rising costs

Materials and labour inflation push new homes out of reach for millions.

03 — SKILLS

Too few trades

A shrinking skilled workforce means conventional building simply can't keep up.

03 — OUR ANSWER

Two technologies. One partner.

01 · Factory-built modularArrives finished. Live in within hours.Capsule pods · Apple Cabins · A-frames · villas · glamping
02 · Robotic 3D printingSmall-house walls in 48–72 hours.Buildatronix 3D gantry robots · on-site · minimal waste
04 — FACTORY-BUILT MODULAR
Turnkey living

Connect. Operate.
Delight.

  • Pre-wired & pre-plumbedBathroom, air conditioning and water heater as standard on capsule models
  • Optionally furnishedMotorised curtains, smart lock, skylights, projector options
  • Built for all climates and terrainsGalvanised steel frame, 80–100 mm PU insulation, double glazing
  • Stack, reconfigure, redeployAdapt to changing demand or group sizes
05 — THE COLLECTION

The collection.

From a 165 sq ft studio to steel-frame villas. Every design can be made bespoke.

SM-05Capsule pod
SM-07Luxury one-bed
SM-08Apple Cabin
SM-MOD10Space pod
A-FramesA-2 · A-3 · A-4
AH-FramesLaunching soon
SM-B02Round villa
TrapezoidNew design
06 — CAPSULE PODS & APPLE CABINS

Engineered
to the millimetre.

All capsule models include a bathroom, air conditioning and water heater. The SM-02 Expand's slide-out rear section adds 10 m² on site.

ModelFootprint (L × W × H)WeightSleeps
SM-058.5 × 3.3 × 3.3 m7.5 t2
SM-0711.5 × 3.3 × 3.3 m8.5 t2 + balcony
SM-0811.5 × 3.0 × 3.0 m8.5 tSemi-bespoke
SM-02 EXP5.85 × 4.2 × 2.48 m · 24 m²2.3 tStudio
SM-MOD1020 × 12 ft (40 ft option)—Studio
Bars show unit length relative to SM-07. Source: Superb Modular Main Brochure. Final specifications are confirmed at order.
07 — A-FRAME & AH-FRAME HOMES

Room to grow.

Highly insulated A-frames for luxury living in nature, from studio to three bedrooms.

AH Studio
165 ft²
A-2 · 2 bed
433 ft²
AH-2 · 2 bed
512 ft²
A-3 · 2 bed
713 ft²
A-4 · 3 bed
713 ft²
AH-3 · 2 bed
788 ft²
AH-4 · 3 bed
980 ft²
Solid = available · Hatched = AH-Frame range, launching soon
08 — ENGINEERING

Serious
underneath.

Main frame

Hot-dip galvanised square tube

2–3 mm
Aluminium alloy shell

Fluorocarbon paint, baked finish

2 mm
PU foam insulation

Thermal & waterproof layer

80–100 mm
Glass curtain wall

Hollow tempered, European grey

6+16A+6
Smart & ambient

Smart lock, light strips, motorised curtains

Standard
INSIDE A CAPSULE
Real interiors, not renders.Ambient lighting · German fittings · built-in HVAC · smart control
09 — HOSPITALITY & GLAMPING
A game-changer for hospitality

Built in months, not years. Open sooner.

Glamping resortsBeachfront villasMountain retreatsGolf clubsResort expansionsAirbnb & VRBO
10 — BUILDATRONIX 3D · ROBOTIC CONSTRUCTION

From digital plan to standing walls.

01

Plan

Architectural drawings are sliced into a print toolpath, with openings and service voids built in.

02

Print

A gantry robot extrudes structural mortar layer by layer. No formwork is needed.

03

Cure & test

Layers bond into cavity walls. Test cubes verify compressive strength.

04

Finish

Roof, windows, electrics and plumbing go in, followed by handover.

THE MACHINE · BUILDATRONIX BT500
BT500 in the Greater Manchester showroom

BT500.

A gantry Cartesian printer built to be affordable, simple to run and easy to ship anywhere.

NOZZLE10 / 20 / 30 / 40 mm round
SPEED100–300 mm/s
LAYER10–30 mm
WEIGHTUnder 1.5 t · fits a 20 ft container
Launch package
£250,000
Robot · mixer pump · laptop & software · tool kit · free training for one person in Manchester (+£5,000 per extra trainee)
11 — SPEED, INDICATIVELY

Weeks become days.

Time to raise the wall structure of a small single-storey home (~60–100 m²).

Conventional masonryBricklaying crew, weather-dependent
≈ 2–4 weeks
3D construction printingIndustry benchmark, ~100 m²
1–4 days
Buildatronix BT500 (stated)Small-house walls
48–72 h
Factory modular podDelivered finished; on-site connection
hours after delivery
Indicative only. Wall/shell time only; groundworks, roof, services, planning and building-control approvals are additional. 3DCP benchmark: COBOD ("1–4 days" for ~100 m² single-storey walls). Buildatronix figure is the company's stated claim, to be verified in the proof-of-concept.
12 — THE TECHNOLOGY ALREADY EXISTS

The industry has
already proven it.

EUROPE · COBOD / PERI

1–4 days

to print the walls of a ~100 m² single-storey home. PERI reports projects ~30% faster than conventional builds.

USA · ICON

−79% cost

Reported fall in printed-wall cost, from ~$160 to ~$34 per sq ft since 2022.

UK · ACCRINGTON

46 homes

Building for Humanity's 3DCP scheme for veterans and low-income families, the first of its kind in the UK.

Third-party figures as reported by the companies and trade press; they are not Superb Modular or Buildatronix 3D results. See the proof-of-concept document for sources.
13 — WHO WE BUILD FOR

One platform, many purposes.

HospitalityResorts & glamping
LandownersPremium accommodation
Short-stayListings in days
EmergencyRelief & workforce
DevelopersSteel-frame & 3DCP
14 — HOW WE DELIVER

Six steps to the keys.

01

Select

Choose a model, or brief our design and sales team.

02

Lay out

Resort and community designers plan multi-unit sites.

03

Book

Booking form plus a 75% advance payment.

04

Inspect

Pre-delivery inspection, in person or on Zoom.

05

Deliver

Transport quoted by distance; installation help available.

06

Hand over

Manual provided; about a two-hour set-up.

LANDOWNERS

Full service: planning advice, layout, listing on Airbnb and Booking.com, marketing and booking management.

LEAD TIMES

Space pods are delivered in about 90 days and installed in hours. A-frames are assembled in about two days.

MARKETS

Europe · GCC · USA · Canada · Australia · New Zealand

15 — PROOF OF CONCEPT

Prove it. Then scale it.

A 16-week, evidence-led pilot with clear go / no-go gates.

WEEKS 1–3

Verify

Documents, certifications, warranty backers, factory audit and supplier references.

GATE AClaims evidenced or withdrawn
WEEKS 4–8

Test the unit

Sample SM-02 / SM-07: thermal imaging, airtightness, fire & electrical inspection.

GATE BMeets UK Building Regs targets
WEEKS 6–12

Print a house

Witnessed demo print of a 40–60 m² wall set, with timing, tolerances and 28-day cube strength.

GATE CWalls in ≤ 72 h print time
WEEKS 10–16

Prove demand

Show home live, operator LOIs and real rental and occupancy data from the first site.

GATE DSigned orders, not waitlists
16 — PROPOSED ROADMAP

The road ahead.

Q4 2026

Verify

PoC launch, document audit, sample unit testing.

Q1 2027

Demonstrate

First witnessed UK demonstration print and first show home.

Q2 2027

Certify

Third-party assurance and warranty route for printed and modular homes.

H2 2027

Deliver

First commercial hospitality sites and 3DCP builds under contract.

2028+

Scale

Regional print crews, repeatable designs, more markets.

Indicative timeline proposed alongside the proof-of-concept. Each stage depends on passing the previous gate.
17 — SHOW HOME PROGRAMME

Host a show home.
Save on yours.

Become a temporary show home and receive a significant discount on your Superb Modular home. If you stay in the programme, you earn a reward each time you introduce prospective buyers, on your own schedule.

Subject to location. Ask us whether yours qualifies.
Superb Modular

Let's build
something superb.

Homes
info@superbmodular.com
BT500 robots
info@buildatronix3d.com
Phone / WhatsApp
+44 7709 014614
Web
thesuperbmodular.com
01 / 18 THESUPERBMODULAR.COM ↗ ← → / SPACE · F FULLSCREEN · P PRINT